Joint compound
A seam coated with joint compound has two materials in it, the board and the compound. The survey identifies each one and samples the compound on its own.
Typical cost in Paramount
Where the survey applies, walls get sampled before anyone cuts into them. Joint compound, plaster and drywall can all hold asbestos, and the lab result decides which of them must come out inside a sealed work area first.
We work on the walls and ceilings of Paramount houses, mobile homes and apartments during remodels, using the survey report as our guide.

A seam coated with joint compound has two materials in it, the board and the compound. The survey identifies each one and samples the compound on its own.
Where the survey applies, plaster is sampled before a wall is chipped or cut. A positive result puts that wall into the removal plan, and a negative one stays tied to the sample it came from.
The survey comes first, then the sealed work area if anything tested positive, and only then does the drywall come down. In California, friable asbestos waste counts as hazardous waste, so a licensed hauler takes it with a manifest.
Wall and ceiling cavities are part of the survey as well. The rule covers all material in them, as necessary to identify and sample it, so a wall is surveyed before a demolition crew puts a tool through it.
A wall that carries load is a structural member, and taking one out is demolition under the district rule, not renovation. That distinction matters in a remodel, because demolition brings the district notice into the job, and a plan that moves a wall has to account for it from the start.
The notice for a demolition has to be with the district no later than 10 working days before the start, so a schedule that opens walls needs room for that wait. A renovation that removes less than 100 square feet of asbestos-containing material is the exception, although work practices and waste rules still govern the job.
After the removal is finished, someone has to check the air, and it is not the abatement crew. An independent consultant performs the clearance air test, because California rules keep contractors from providing that service. The arrangement keeps the removal crew from testing the air it worked in.
How the survey carve-out applies depends on the building, so landlords should look at what they own. A rented house is a single-unit dwelling, and a renovation there that removes less than 100 square feet can qualify. An apartment building, townhouse or condominium is not a single-unit dwelling, and a demolition does not qualify in any building at all.
Identification comes before removal, so start with asbestos testing or return home.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (562) 635-8371