Renovation and Demolition Abatement in Paramount

Typical cost in Paramount

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+

Before a remodel or a teardown can go ahead, material that tested positive has to leave the building. We take it out, file the district notice online and hand the building crew a work area it can start in.

Every demolition needs the district notice, and a load-supporting wall coming out counts as demolition under the rule, whether it is one wall or a whole house.

Request a free quote
Empty room with the walls and windows covered in clear plastic sheeting, a bare wood floor and a light blue-gray portable air machine with a flexible hose.

What comes out before the work

Kitchens and baths

Remodeling a kitchen or bathroom opens floors, walls and ceilings, which makes it renovation. The survey identifies what those surfaces contain, and the abatement crew removes whatever tested positive before the remodel crew begins.

Additions and bearing walls

Removing a bearing wall for an addition or a new opening is demolition under the rule. That brings the district notice, even though the rest of the house may stay standing.

Whole-house teardowns

Teardowns require the survey and the district notice. The waste from material that tested positive leaves the site with its manifest, and the notice has to be with the district no later than 10 working days before the work begins.

Apartment units

The survey carve-out for small renovations does not apply in an apartment building, so a unit turnover that opens walls or floors is surveyed first.

Demolition permits and the district notice

The city’s Building Safety Month post says demolition work involving asbestos must follow strict protocols. Rule 1403 sets the district notice on its own, and we file it online. Separately, a permit applicant hands the building department a copy of that notice, which state law requires according to the district, and which ties the notice to the permit.

Timing

Demolition needs the notice no later than 10 working days before it starts. Renovation that removes less than 100 square feet is the exception, and the district counts a notice as received only when the notification fee comes with it.

Checking a contractor

Where the job involves 100 square feet or more, ask for the Contractors State License Board number first. Then check for the C-22 Asbestos Abatement classification or the asbestos certification, and ask for the Cal/OSHA registration too. The same questions apply to any contractor you consider.

The survey precedes all of this, so see asbestos testing or the home page.