HVAC Duct and Pipe Insulation Removal in Paramount

Typical cost in Paramount

  • Duct wrap at the furnace or a few duct joints$1,200 – $3,000+
  • All attic ducts in a house, removal only (new ducts extra)$2,500 – $6,500+
  • Pipe or boiler insulation, up to about 50 ft$1,000 – $2,500+

Heating, ventilation and air conditioning work is pulled into the rule because installing or removing an HVAC system is renovation. That is why old duct wrap, tape and pipe insulation are sampled before the change-out starts instead of after the ducts have been opened.

When the lab result is positive we remove the material from the attic or furnace closet in a sealed work area. Call us for a free, personalized quote.

Request a free quote
Attic with silver-gray foil-wrapped round ducts running along the rafters, a plank walkway and loose insulation between the joists.

Insulation we remove

Duct wrap and tape

Wrap and tape at the duct joints are sampled before a change-out. A positive result means the material is removed, bagged and hauled off before the new ducts go in, so the new system never meets the old wrap.

Pipe insulation

Pipe insulation is surveyed on its own, and its result sits in the report beside the duct results.

Furnace closets

Insulation in a furnace closet is sampled as well, and anything positive is removed in a sealed work area. New equipment and new ducts are a separate price from the removal work, so the two quotes stay easy to compare.

Attic ducts

Attic duct runs are surveyed before the HVAC work begins. A run that tested positive is removed first, so the HVAC crew can work without it.

Planning the work

An HVAC change-out is renovation, so the district rules apply before anyone cuts into a duct, and a survey is part of that unless the small single-unit carve-out applies. Check the result first, then schedule the equipment crew.

Notice

Not every HVAC change-out needs a district notice. When less than 100 square feet of asbestos-containing material is removed, none is needed. Once the amount reaches 100 square feet or more, the notice is due no later than 10 working days before the start, and we file it online and send the notification fee along with it.

Contractor scope

Hiring for a duct job begins with the contractor’s license number from the Contractors State License Board. Look it up and, for a job of 100 square feet or more, confirm the C-22 Asbestos Abatement classification, which the board describes as covering containment, encapsulation or removal, and disposal, or the ASB certification, before anyone sets up in your attic or furnace closet and starts taking duct wrap down.

Air test

Once removal is finished, an independent consultant and not the removal crew performs the clearance air test.

Samples come first, so read asbestos testing, or head to the home page.