Ceiling texture
If a manufactured home has sprayed or popcorn texture overhead, a sample tells you what it is. A positive result is removed in a sealed work area.
Typical cost in Paramount
One Paramount home in ten is a mobile home, and the district rule has no carve-out written for manufactured homes. A survey comes prior to any demolition or renovation here as it does for a house, and the rule’s small-job survey carve-out is worded for residential single-unit dwellings, so whether a given home qualifies depends on that definition.
We work in mobile and manufactured homes the way we work in any other home, from the sample to the waste manifest.

If a manufactured home has sprayed or popcorn texture overhead, a sample tells you what it is. A positive result is removed in a sealed work area.
Vinyl floor tile and sheet vinyl in a manufactured home fall under the same floor covering definition as in a house, with the same line of more than one percent asbestos.
Wrecking a whole manufactured home is a demolition, and a demolition brings the district notice. We file it online, and it has to reach the district no later than 10 working days before the work starts.
Remodeling the inside of a manufactured home is renovation. Where the survey applies, sampling takes in each flooring layer to the joist and whatever the wall and ceiling cavities hold, as needed, across the whole interior.
The district rule has no section written for manufactured homes, so the general rules carry through.
Before a manufactured home is demolished or renovated, the survey comes prior to any demolition or renovation. The person doing it must be certified by Cal/OSHA as an asbestos consultant or technician and must have passed the EPA-approved Building Inspector course, as for any house.
A crew removing 100 square feet or more of asbestos-containing material needs its employer registered with Cal/OSHA. The contractor needs the C-22 or ASB certification as well, and both are worth asking about before work in a mobile home starts.
Friable asbestos waste from a manufactured home is handled as hazardous waste in California. It leaves the property with a manifest, the same paperwork a house job would produce.

Houses follow the same steps, shown under renovation and demolition abatement, or go home.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (562) 635-8371